Engineering, Parks and Environment Projects

Design Criteria Manual

The Design Criteria Manual (DCM) outlines the required engineering design and construction standards in the City of Langley for both land developments and all other capital/operating projects in the City. The requirements in the City’s DCM are to be read in conjunction with the City’s Subdivision and Development Servicing Bylaw, 2021, No. 3126.

Check out the Financial Plan for budget information and the list of the City's Capital Improvement Program.

Construction Projects
Fraser Highway One Way Utility & Road Upgrades

Location: Fraser Highway from 204 Street to 206 Street

Estimated Duration: Fall 2024 - Spring 2026 

Estimated Investment: $18 million

Project Details:

  • Replace the aging water main and services

  • Replace the aging sanitary and storm sewers and services between

  • Underground BC Hydro Transmission Infrastructure between

  • Surface Works include paving, concrete curbs, concrete sidewalks, pavers, streetlights, tree planting, shrub planting, benches, tables, electrical, irrigations, grass etc.

Contractor Name: TBD

City Project Manager: Goran Corda

56 Avenue Water, Storm, and Sanitary Sewer Replacement

Location: 56 Avenue from 200 Street to 203 Street

Estimated Completion: Spring 2024 

Estimated Investment: $5 million

Project Details:

  • Replace the aging water main and services between 200 Street and 203 Street
  • Replace the aging storm sewer and services between 200 Street and 203 Street
  • Upgrade the existing Traffic Signal on 56 Avenue at 201A Street

City Project Manager: Goran Corda

Contractor Name: McDonald & Ross Construction LTD.

202 Street Area, Utilities and Road Rehabilitation

Location: 202 Street Area south of 48 Avenue

Estimated Duration: May to Spring 2025

Estimated Investment: $3.5 million

Project Details:

  • Replace the aging water main and services south of 48 Avenue
  • Replace the aging storm sewer and services south of 48 Avenue
  • Road Paving

City Project Manager: Ghazal Shirazian

Contractor Name: All Roads Construction

 

Fraser Highway Cycling Improvements

Location: Fraser Highway from Langley Bypass (20800 Block) to Old Yale Road

Estimated Duration: May to Winter 2024

Estimated Investment: $200,000

Project Details:

  • Implementation of street-level protected cycling facilities.

City Project Manager: Moudud Hasan

Contractor Name: TBD

Traffic Signal Projects

Location: Various locations

Estimated Duration: May to Spring 2025

Estimated Investment: $750,000

Project Details:

  • Traffic Signal Upgrades on Fraser Hwy at 200 Street
  • Traffic Signal Upgrades on Fraser Hwy at 204 Street
  • Traffic Signal Upgrades on Fraser Hwy at 208 Street
  • Traffic Signal Upgrades on 56 Avenue at Langley Bypass
  • New Traffic Signal on 208 Street at 45A Avenue

City Project Manager: Moudud Hasan

Contractor Name: TBD

Fraser Highway Water Main Replacement and Paving

Location: Fraser Highway from 201 A Street to 203 Street

Estimated Completion: Summer 2024 

Estimated Investment: $2.2 million

Project Details:

  • Replace 340 metres of existing AC water main
  • Pavement rehabilitation

Temporary Impacts:

  • Traffic lane and sidewalk closures 
  • Temporary no parking 

City Project Manager: Ghazal Shirazian

Contractor Name: TBD

200 Street Paving

Location: 200 Street from 44 Avenue to 49 Avenue

Estimated Duration: TBD

Estimated Investment: TBD

Project Details:

  • Northbound pavement rehabilitation

Temporary Impacts:

  • Traffic lane and sidewalk closures 
  • Temporary no parking 

City Project Manager: Ghazal Shirazian

Contractor Name: TBD

Michaud Crescent Improvements & Water Main Replacement

Location: Michaud Crescent from 200 Street to 203 Street

Estimated Duration: April 2024 to Fall 2024 

Estimated Investment: $2.4 million

Project Details:

  • Road rehabilitation and reconstruction
  • Replacement of aging water main
  • Protected bike lane along the south side 
  • Intersection safety improvements
  • Retention of existing trees and addition of new trees

Temporary Impacts:

  • Temporary parking prohibitions along Michaud Crescent
  • Sidewalk detours 
  • Extended closure of the south side 
  • Construction noise to be expected from 7 am to 7 pm

City Project Manager: Moudud Hasan

Contractor Name: Arsalan Construction LTD.

Michaud Greenway Paving

Location: Michaud Crescent from 53 Avenue to 200 Street

Estimated Completion: Summer 2024 

Estimated Investment: TBD

Project Details:

  • Paving of existing gravel trail to a 3-metre wide pathway
  • Vehicle intrusion deterrent measures 

Temporary Impacts:

  • Temporary trail closure
  • Construction equipment and noise from 7 am to 7 pm

City Project Manager: Moudud Hasan

Contractor Name: TBD

Douglas Crescent and 203 Street Intersection Improvements

Location: Northwest corner of Douglas Crescent and 203 Street intersection

Estimated Duration: April to Summer 2024 

Estimated Investment: $300,000

Project Details:

  • Corner reconstruction for pedestrian safety improvement
  • Accessibility improvement
  • Landscaping improvement
  • Traffic signal upgrades 

Temporary Impacts:

  • Sidewalk closures and detours
  • 203 Street Southbound lane closure
  • 56 Avenue Westbound curb lane closure

City Project Manager: Moudud Hasan

Contractor Name: Lil Bear Contracting Corp.

200 Street Culvert Upgrade

Location: Baldi Creek at 200 Street (5400 Block)

Estimated Duration: Summer 2024 to Fall 2024 

Estimated Investment: $2 million

Project Details:

  • Re-lining of the existing two steel (CSP) deteriorating culverts with HDPE lining 

Temporary Impacts:

  • Traffic lane and sidewalk closures 

City Project Manager: Goran Corda

Contractor Name: TBD

Nicomekl Floodplain Pedestrian Bridge Replacement

Location: 20650 53A Avenue

Estimated Duration: Summer 2024 to Fall 2024 

Estimated Investment: $1 million

Project Details:

  • Replace the existing aging suspension bridge with a single-span steel truss bridge

Temporary Impacts:

  • Pedestrian bridge closure

City Project Manager: Goran Corda

Contractor Name: TBD

McBurney Plaza Resurfacing

Location: 20518 Fraser Highway

Estimated Duration: Fall 2023 to Spring 2024

Estimated Investment: $600,000

Project Details:

  • Replace the upper timber deck
  • Replace the existing lower timber deck with new pavers
  • Replace two existing trees and install silva cells

Temporary Impacts:

  • Plaza closure
  • Parking closure south of the plaza

City Project Manager: Goran Corda

Contractor Name: Cedar Crest Lands (BC) Ltd.

More information

For more information on planning projects and ongoing construction projects in the City, please contact the City Engineering, Parks, and Environment Department at 604.514.2997 or email engineering@langleycity.ca.

For after-hours emergency issues, please call 604.543.6722

Urban Forest Management Strategy 2050